  • Thermal renovation, change of the source and installation of air recuperation in primary school Podolí

    Podolí, Zlín Region, Czech Republic

    The municipality submitted the application for funding to the national Operational Programme Environment 2014-2020, with the support from the Energy Agency of the Zlín Region. The application succeeded and the project was approved for funding. The final share of the subsidy from OP Environment was 30,4 % from the overall investment costs.

    The facade was improved by 16 cm of EPS with λ= 0,039 W/(mK). The ceiling was insulated with 200 mm mineral wool with λ= 0,037 W/(mK). The existing windows with an average U-value of 2,7 W/(m²K) were replaced by new plastic windows with a U-value of 0,9 W/(m²K). The doors were improved to U = 1,2 W/(m²K)).

    The air recuperation for the whole school was projected with the overall power of 1 475 m3/h because of the inadequate indoor environment.

    Nowadays, the heating demand of the building is 69 kWh/(m2.a), which means B-class for this type of building.

    Benefits

    Overall reconstruction of the school has a positive effect on the energy consumption and long-term sustainability of the whole project. 

    Project has generally improved visual appearance of the whole building. 

    Mechanical air-ventilation is necessary for the suitable indoor clime. Comfortable place for the teachers and students another benefit of the building upgrade. 

    Implementation year: 2020